Site Selection And Trial Execution

No Thumbnail Available
Date
1995
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Kenya Agriculture Research Institute
Abstract
There will be 14 new sites which will be opened in the ASAL Areas. (Basically zones 4 and 5 1. 900mm - 700mm annual rainfall). These will be run in collaboration with the soil and water conservation team from Katumani. Water harvesting techniques will be an integral part of the fertelizer trials.
Description
Keywords
Citation
Collections