Recommendations For The Rehabilitation Of The Irrigation Works At Nprc - Tigoni

No Thumbnail Available
Date
1994
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Kenya Agricultural Research Institute
Abstract
On request by the Centre Director, NPRC - Tigoni, rehabilitation needs of the irrigation works were assessed. The rehabilitation needs include: i) The acquisition and installation of a new pump with a capacity of 83m3/hr against 93m and a compatible electric motor of about 50 HP. ii) Improvement of the pump house by constructing a new roof. iii) Purchase of 36 sprinklers, 132 aluminium pipes and fittings to enable the setting up of 36 sprinklers using 6 laterals. iv) Extending the 3 phase power line to the pump house. v) Protecting the stream which feeds the dam by ensuring that cultivations do not take place on its banks and that necessary soil conservation measures are taken. (