The progress of construction of the new office-Cum-laboratory building at NAL very slow. Completion was estil"1ated at 657. by the end of the year. The delay was attributed by the contractor to the creditor's taking, the lion's share of the contractor’s payments thus leaving him with cash flow problems. There was no further development on the establishment of the Yala (Swamp) Agricu1tura1 Research Station since the shelving of the plans in 1) December1981. The 100 m section of T2, canal leading to the Red soils Experiments Site at Mwea was lined by IT) staff assisted by hired casual labour. A few more irrigation and drainage channels were constructed in the farm in preparation for surface irrigation trials.